Scheduling a storage-augmented discrete production facility under incentive-based demand response.
Timm WeitzelChristoph H. GlockPublished in: Int. J. Prod. Res. (2019)
Keyphrases
- wafer fabrication
- production cost
- production planning
- production inventory
- lot size
- production scheduling
- tertiary storage
- single facility
- scheduling problem
- shop floor
- transportation costs
- multi period
- scheduling algorithm
- planning horizon
- capacity planning
- preventive maintenance
- production rate
- parallel machines
- capacity expansion
- production system
- information asymmetry
- inventory policy
- profit maximizing
- storage space
- disk storage
- capacity allocation
- location problems
- batch processing
- production line
- lead time
- mixed integer programming model
- single product
- selling season
- inventory systems
- distribution network
- real time database systems
- total cost
- data storage
- integer programming
- manufacturing systems
- file system
- single machine
- resource allocation