Login / Signup

An event-driven approach with makespan/cost tradeoff analysis for project portfolio scheduling.

Hsing-Pei KaoBrian WangJames DongKuo-Cheng Ku
Published in: Comput. Ind. (2006)
Keyphrases
  • event driven
  • scheduling problem
  • metadata
  • case study
  • high level
  • batch processing
  • construction project