Bi-criteria and tri-criteria analysis to minimize maximum lateness makespan and resource consumption for scheduling a single machine.
Liron YedidsionPublished in: J. Sched. (2012)
Keyphrases
- single machine
- maximum lateness
- completion times
- release dates
- scheduling problem
- bicriteria
- processing times
- flowshop
- resource consumption
- scheduling jobs
- single machine scheduling problem
- batch processing machines
- job processing times
- release times
- sequence dependent setup times
- total weighted tardiness
- setup times
- deteriorating jobs
- precedence constraints
- parallel machines
- np hard
- special case
- dynamic programming
- weighted sum
- genetic algorithm