Login / Signup

Scheduling and rescheduling with iterative repair.

Monte ZwebenEugene DavisBrian DaunMichael Deale
Published in: IEEE Trans. Syst. Man Cybern. (1993)
Keyphrases
  • iterative repair
  • earth observing
  • database
  • job shop
  • data sets
  • shop floor
  • project scheduling
  • scheduling algorithm
  • evolutionary algorithm
  • manufacturing systems
  • limited capacity