Login / Signup

A study on integrating sequence dependent setup time flexible flow lines and preventive maintenance scheduling.

Bahman NaderiMostafa ZandiehSeyyed M. T. Fatemi Ghomi
Published in: J. Intell. Manuf. (2009)
Keyphrases
  • preventive maintenance
  • scheduling problem
  • multi dimensional
  • image sequences
  • object oriented
  • software engineering
  • manufacturing cell