On the beat of the drum: improving the flow shop performance of the Drum-Buffer-Rope scheduling mechanism.
Matthias ThürerMark StevensonPublished in: Int. J. Prod. Res. (2018)
Keyphrases
- scheduling problem
- flowshop
- buffer allocation
- job shop
- unrelated parallel machines
- setup times
- sequence dependent setup times
- maximum lateness
- single machine
- precedence constraints
- processing times
- flowshop scheduling
- manufacturing cell
- parallel machines
- tabu search
- preventive maintenance
- minimizing makespan
- np hard
- makespan minimization
- job shop scheduling
- flowshop scheduling problems
- open shop
- real time database systems
- special case
- completion times
- lot streaming
- job shop scheduling problem
- release dates
- resource allocation
- scheduling jobs
- response time
- simulated annealing
- multistage
- production system
- scheduling algorithm
- permutation flowshop
- asymptotic optimality
- identical parallel machines
- resource constrained
- computational complexity