Login / Signup

Production smoothing and buffer stock reduction for two-stage production and inventory systems.

Kazuyoshi IshiiShusaku Hiraki
Published in: Int. J. Manuf. Technol. Manag. (2000)
Keyphrases
  • inventory systems
  • production system
  • base stock policy
  • lead time
  • inventory level
  • multi item
  • single stage
  • decision making
  • reinforcement learning
  • special case
  • scheduling problem
  • high volume
  • production cost