Scheduling cooperative gantry cranes with seaside and landside jobs.
Florian JaehnDominik KressPublished in: Discret. Appl. Math. (2018)
Keyphrases
- cooperative
- parallel machines
- identical parallel machines
- scheduling problem
- identical machines
- container terminal
- job scheduling
- minimize total
- release dates
- unrelated parallel machines
- processing times
- scheduling strategy
- scheduling jobs
- optimal scheduling
- release times
- single machine
- computational grids
- wafer fabrication
- precedence constraints
- setup times
- scheduling algorithm
- flowshop
- scheduling policies
- weighted tardiness
- deteriorating jobs
- maximum lateness
- precedence relations
- batch processing machines
- sequence dependent setup times
- batch processing
- single machine scheduling problem
- round robin
- fixed number
- optimal design
- list scheduling
- completion times
- total cost
- single server
- scheduling decisions
- multi agent systems
- resource allocation
- flexible manufacturing systems
- travel time
- quay cranes
- np hard
- job shop
- multi agent
- approximation algorithms
- resource constraints
- parallel computing