Minimizing the sum of makespan on multi-agent single-machine scheduling with release dates.
Xinyue WangTao RenDanyu BaiChinenye EzehHaodong ZhangZhuoran DongPublished in: Swarm Evol. Comput. (2022)
Keyphrases
- completion times
- release dates
- single machine scheduling problem
- single machine
- processing times
- scheduling problem
- release times
- sequence dependent setup times
- maximum lateness
- branch and bound algorithm
- precedence constraints
- scheduling jobs
- flowshop
- reinforcement learning
- setup times
- combinatorial optimization
- deteriorating jobs
- parallel machine scheduling problem
- dynamic programming
- np hard
- search procedure
- resource consumption
- parallel machines
- upper bound
- lower bound
- computational complexity
- optimal solution