Login / Signup
Stepwise Optimization for Model of Integrated Batch Production and Maintenance Scheduling for Single Item Processed on Flow Shop with Two Machines in JIT Environment.
Zahedi
Rojali
Rinto Yusriski
Published in:
ICCSCI (2017)
Keyphrases
</>
scheduling problem
flowshop
parallel machines
mathematical model
probabilistic model
single item
unrelated parallel machines
probability distribution
single machine
long run
sequence dependent setup times