Login / Signup

Stepwise Optimization for Model of Integrated Batch Production and Maintenance Scheduling for Single Item Processed on Flow Shop with Two Machines in JIT Environment.

Zahedi RojaliRinto Yusriski
Published in: ICCSCI (2017)
Keyphrases
  • scheduling problem
  • flowshop
  • parallel machines
  • mathematical model
  • probabilistic model
  • single item
  • unrelated parallel machines
  • probability distribution
  • single machine
  • long run
  • sequence dependent setup times