A case study of a hybrid flow shop with no-wait and limited idle time to minimize material waste.
Houda HarbaouiSoulef KhalfallahOdile Bellenguez-MorineauPublished in: SISY (2017)
Keyphrases
- scheduling problem
- flowshop
- single machine
- completion times
- single machine scheduling problem
- job processing times
- processing times
- maximum lateness
- flowshop scheduling
- sequence dependent setup times
- precedence constraints
- makespan minimization
- setup times
- flowshop scheduling problems
- open shop
- np hard
- job shop scheduling
- tabu search
- unrelated parallel machines
- minimizing makespan
- special case
- job shop
- asymptotic optimality
- lot streaming
- job shop scheduling problem
- permutation flowshop
- manufacturing cell
- strongly np hard
- release dates
- np complete
- neural network