CIGI2011: A heuristic method for resource-constrained project scheduling with activity overlapping.
Lucas GrèzeRobert PellerinPatrice LeclaireNathalie PerrierPublished in: J. Intell. Manuf. (2014)
Keyphrases
- high accuracy
- synthetic data
- detection method
- clustering method
- dynamic programming
- experimental evaluation
- input data
- heuristic methods
- exhaustive search
- combinatorial optimization
- high precision
- detection algorithm
- computationally efficient
- computational cost
- cost function
- significant improvement
- objective function
- support vector machine
- theoretical analysis
- artificial neural networks
- image retrieval
- pairwise
- optimization method
- similarity measure
- feature selection
- genetic algorithm