Lunar cycle inspired PSO for single machine total weighted tardiness scheduling problem.
Shruti GuptaRajani KumariRishi Pal SinghPublished in: Evol. Intell. (2021)
Keyphrases
- total weighted tardiness
- single machine
- scheduling problem
- particle swarm optimization pso
- processing times
- particle swarm optimization
- makespan minimization
- earliness tardiness
- sequence dependent setup times
- maximum lateness
- flowshop
- release dates
- setup times
- np hard
- single machine scheduling problem
- production scheduling
- job shop scheduling
- hybrid algorithm
- job shop scheduling problem
- tabu search
- parallel machines
- job shop
- differential evolution
- precedence constraints
- evolutionary algorithm
- genetic algorithm