Login / Signup

A modelling and simulation study of a metro line as a time-delayed switched system.

Berkin BirolAli Fuat Ergenç
Published in: J. Rail Transp. Plan. Manag. (2022)
Keyphrases
  • simulation study
  • monte carlo
  • line segments
  • traffic control
  • database
  • decision making
  • artificial intelligence
  • image processing
  • database systems
  • video sequences
  • multiresolution
  • reverse engineering