Login / Signup

The Berth-Quay Cranes and Trucks Scheduling Optimization Problem by Hybrid Intelligence Swam Algorithm.

Yi LiuSabina Shahbazzade
Published in: Int. J. Cogn. Informatics Nat. Intell. (2017)
Keyphrases