Scheduling a Fuzzy Flowshop Problem with Flexible Due Dates Using Ant Colony Optimization.
Sezgin KilicPublished in: EvoWorkshops (2007)
Keyphrases
- ant colony optimization
- flowshop
- scheduling problem
- processing times
- dispatching rule
- sequence dependent setup times
- setup times
- preventive maintenance
- maximum lateness
- metaheuristic
- parallel machines
- release dates
- ant colony
- swarm intelligence
- single machine
- minimizing makespan
- flowshop scheduling
- job processing times
- traveling salesman problem
- nature inspired
- aco algorithm
- bicriteria
- ant colonies
- ant colony optimization algorithm
- precedence constraints
- combinatorial optimization problems
- particle swarm optimization
- identical parallel machines
- ant colony algorithm
- fuzzy logic
- tabu search
- genetic algorithm
- artificial ants
- hybrid algorithm
- np hard
- particle swarm optimization pso
- completion times
- single machine scheduling problem
- aco algorithms
- resource consumption
- job shop scheduling problem
- production scheduling