Sign in

Dimensioning reserve bus fleet using life cycle cost models and condition based/predictive maintenance: a case study.

Hugo RaposoJosé Torres FarinhaLuís FerreiraDiego Galar
Published in: Public Transp. (2018)
Keyphrases
  • life cycle
  • metamodel
  • business models
  • total cost
  • predictive model
  • service delivery
  • mass production
  • power system