An Aggregated Rank Removal Heuristic Based Adaptive Large Neighborhood Search for Work-over Rig Scheduling Problem.
Naveen ShajiCheruvu Syama SundarBhushan G. JagyasiSushmita DuttaPublished in: PReMI (1) (2019)
Keyphrases
- scheduling problem
- single machine
- np hard
- metaheuristic
- flowshop
- tabu search
- neural network
- vehicle routing
- precedence constraints
- parallel machines
- multi camera
- vehicle routing problem
- combinatorial optimization
- data sets
- setup times
- sequence dependent setup times
- constrained problems
- total tardiness
- minimizing makespan