Login / Signup

A study of cost overruns in complex multi-stakeholder road projects in the United Arab Emirates.

Ihsan Issa Ahmad Al HosaniFikri T. DweiriUdechukwu Ojiako
Published in: Int. J. Syst. Assur. Eng. Manag. (2020)
Keyphrases
  • case study
  • complex systems
  • database
  • real world
  • data mining
  • high level
  • empirical studies
  • total cost
  • high cost