Exploration of a minimum tardiness dispatching priority for a flexible manufacturing system-a combined simulation/optimization approach.
Susumu MoritoKeun Hyung LeeKiyohisa MizoguchiHiroshi AwanePublished in: WSC (1993)
Keyphrases
- flexible manufacturing systems
- manufacturing systems
- dynamic scheduling
- scheduling problem
- design space exploration
- real time control
- dispatching rule
- optimization problems
- global optimization
- single machine
- simulation model
- constrained optimization
- single machine scheduling problem
- optimization algorithm
- metabolic engineering
- optimization method
- simulation models
- simulation environment
- combinatorial optimization
- sequence dependent setup times
- petri net
- lower bound
- neural network