Scheduling two job families on a single machine with two competitive agents.
Shi-Sheng LiRen-Xia ChenQi FengPublished in: J. Comb. Optim. (2016)
Keyphrases
- single machine
- release times
- maximum lateness
- release dates
- scheduling problem
- competitive ratio
- scheduling jobs
- deteriorating jobs
- processing times
- identical parallel machines
- identical machines
- minimize total
- single machine scheduling problem
- sequence dependent setup times
- job processing times
- total weighted tardiness
- flowshop
- multiple agents
- weighted tardiness
- earliness tardiness
- weighted number of tardy jobs
- completion times
- number of tardy jobs
- total tardiness
- rolling horizon
- setup times
- precedence constraints
- number of late jobs
- shortest processing time
- dynamic programming
- learning effect
- parallel machines
- job shop
- resource allocation
- dispatching rule
- production scheduling
- tabu search
- np hard
- job shop scheduling
- resource consumption
- production system