Login / Signup

Integrated planning and scheduling in the engineer-to-order sector.

David LittleRalph RollinsMatthew PeckJ. Keith Porter
Published in: Int. J. Comput. Integr. Manuf. (2000)
Keyphrases
  • planning problems
  • neural network
  • scheduling algorithm
  • data sets
  • machine learning
  • decision trees
  • case study
  • evolutionary algorithm
  • dynamic environments
  • flexible manufacturing systems