Login / Signup

Two-machine flow shop scheduling with an operator non-availability period to minimize makespan.

Dawei LiXiwen Lu
Published in: J. Comb. Optim. (2020)
Keyphrases
  • special case
  • computational power
  • database
  • information technology
  • aggregation operators