Login / Signup

A combined usage of stochastic and quantitative risk assessment methods in the worksites: Application on an electric power provider.

P. K. MarhavilasDimitris E. Koulouriotis
Published in: Reliab. Eng. Syst. Saf. (2012)
Keyphrases
  • electric power
  • databases
  • genetic algorithm
  • case study
  • genetic programming