Login / Signup

Deadlock control and hybrid social spider scheduling algorithm for two-stage assembly permutation flowshop with limited buffers.

Feng CaoYanxiang FengSiyi WangGuanghui ZhangKeyi Xing
Published in: Expert Syst. Appl. (2024)
Keyphrases
  • scheduling algorithm
  • permutation flowshop
  • response time
  • scheduling problem
  • upper bound
  • scheduling strategy
  • computational grids
  • scheduling policies
  • worst case
  • peer to peer
  • grid environment
  • strongly np hard