Minmax due-date assignment on a two-machine flowshop.
Baruch MorGur MosheiovPublished in: Ann. Oper. Res. (2021)
Keyphrases
- flowshop
- processing times
- scheduling problem
- single machine
- number of tardy jobs
- special case
- sequence dependent setup times
- minimizing total tardiness
- maximum lateness
- bicriteria
- setup times
- flowshop scheduling
- total tardiness
- makespan minimization
- minimizing makespan
- tabu search
- release dates
- total weighted tardiness
- flowshop scheduling problems
- robotic cell
- np hard
- job processing times
- strongly np hard
- precedence constraints
- parallel machines
- completion times
- job shop scheduling problem
- permutation flowshop
- single machine scheduling problem
- competitive ratio
- resource consumption
- lot streaming
- np complete
- production scheduling