Login / Signup

Compensating for part arrival uncertainties in two-processing-machine, one-buffer flow lines: Inventory flexibility design based on the system transient performances.

Ying MeiZhigang Zeng
Published in: Robotics Comput. Integr. Manuf. (2022)
Keyphrases
  • user interface
  • data processing
  • steady state
  • manufacturing cell
  • batch processing
  • real time
  • expert systems
  • special case
  • design process
  • hough transform
  • line drawings
  • engineering design