Two due date assignment problems in scheduling a single machine.
Dvir ShabtayGeorge SteinerPublished in: Oper. Res. Lett. (2006)
Keyphrases
- single machine
- scheduling problem
- minimize total
- release dates
- maximum lateness
- processing times
- scheduling jobs
- release times
- sequence dependent setup times
- weighted tardiness
- total tardiness
- total weighted tardiness
- rolling horizon
- earliness tardiness
- number of tardy jobs
- production scheduling
- identical machines
- single machine scheduling problem
- setup times
- parallel machines
- job shop scheduling
- deteriorating jobs
- weighted number of tardy jobs
- learning effect
- optimization problems
- flowshop
- resource allocation
- precedence constraints
- np hard
- combinatorial optimization problems
- benchmark problems
- combinatorial optimization
- number of late jobs