Login / Signup

Modification of the Peck Formula for a Double-Track Shield Tunnel under Expressway Subgrade.

Yuxiang LiJuncen LinSonghong YanJiaxuan Du
Published in: Symmetry (2022)
Keyphrases
  • construction process
  • simulation model
  • data structure
  • universally quantified
  • search space
  • shortest path
  • real time tracking