Login / Signup

Two-Stage, Multiple-Lot, Lot Streaming Problem for a 1 + 2 Hybrid Flow Shop.

Subhash C. SarinMing Cheng
Published in: MIM (2013)
Keyphrases
  • lot streaming
  • flowshop
  • multistage
  • harmony search algorithm
  • production system
  • scheduling problem
  • numerical optimization
  • processing times
  • single machine
  • setup times
  • open shop