Login / Signup
The contractor time-cost-credit trade-off problem: integer programming model, heuristic solution, and business insights.
Sameh Al-Shihabi
Mohammad M. Aldurgam
Published in:
Int. Trans. Oper. Res. (2020)
Keyphrases
</>
integer programming
mathematical model
integer program
special case
evolutionary algorithm
np hard
belief propagation
knapsack problem
network architecture
optimization model
heuristic solution