Login / Signup

Multiple time-scale optimization scheduling for islanded microgrids including PV, wind turbine, diesel generator and batteries.

Zhaoxia XiaoJiakai NanJosep M. GuerreroHongwei Fang
Published in: IECON (2017)
Keyphrases
  • wind turbine
  • optimization problems
  • data mining
  • resource allocation
  • scheduling algorithm
  • scheduling problem
  • multiple objectives
  • databases
  • optimization algorithm
  • wind speed