Login / Signup

Queue time and x-factor characteristics for semiconductor manufacturing with small lot sizes.

Kilian SchmidtOliver Rose
Published in: CASE (2007)
Keyphrases
  • semiconductor manufacturing
  • lot size
  • process control
  • discrete event simulation
  • decision making
  • arrival rate
  • real time
  • objective function
  • optimization problems
  • total cost
  • queue length