Login / Signup
A heuristic algorithm for joint optimisation of MRP and scheduling in a mixed model assembly line.
Pl. K. Palaniappan
N. Jawahar
Published in:
Int. J. Adv. Oper. Manag. (2009)
Keyphrases
</>
probabilistic model
information retrieval