Login / Signup

A heuristic algorithm for joint optimisation of MRP and scheduling in a mixed model assembly line.

Pl. K. PalaniappanN. Jawahar
Published in: Int. J. Adv. Oper. Manag. (2009)
Keyphrases
  • probabilistic model
  • information retrieval