Minimizing energy consumption and makespan in a two-machine flowshop scheduling problem.
S. Afshin Mansouri
Emel Aktas
Published in:
J. Oper. Res. Soc. (2016)
Keyphrases
</>
flowshop
energy consumption
scheduling problem
completion times
total energy
energy efficient
wireless sensor networks
processing times
single machine
energy saving
energy efficiency
sequence dependent setup times
sensor networks
bicriteria
flowshop scheduling
setup times
minimizing makespan
strongly np hard
energy conservation
special case
minimizing total tardiness
tabu search
unrelated parallel machines
data transmission
routing protocol
sensor nodes
total tardiness
preventive maintenance
total weighted tardiness
lot streaming
maximum lateness
maximum tardiness
makespan minimization
base station
flowshop scheduling problems
data center
total flowtime
precedence constraints
np hard
permutation flowshop
job shop
parallel machines
residual energy
open shop
dynamic programming