Iterative algorithms for batching and scheduling to minimise the total job tardiness in two-stage hybrid flow shops.
Jae-Min YuRong HuangDong-Ho LeePublished in: Int. J. Prod. Res. (2017)
Keyphrases
- iterative algorithms
- single machine
- release times
- release dates
- scheduling jobs
- job processing times
- scheduling problem
- single machine scheduling problem
- processing times
- completion times
- flowshop
- minimize total
- sequence dependent setup times
- precedence constraints
- maximum lateness
- parallel machines
- identical parallel machines
- setup times
- batch processing
- total weighted tardiness
- number of tardy jobs
- single machine scheduling
- production system
- identical machines
- tardiness penalties
- branch and bound algorithm
- iterative methods
- deteriorating jobs
- job shop
- competitive ratio
- production scheduling
- np hard
- denoising
- dynamic programming
- job shop scheduling problem
- combinatorial optimization
- tardiness cost
- data mining
- batch processing machines