The integrated berth allocation, quay crane assignment and scheduling problem: mathematical formulations and a case study.
Omar Abou KasmAli DiabatT. C. E. ChengPublished in: Ann. Oper. Res. (2020)
Keyphrases
- quay crane
- scheduling problem
- container terminal
- parallel genetic algorithm
- single machine
- quay cranes
- flowshop
- np hard
- optimal scheduling
- quay crane scheduling
- processing times
- permutation flowshop
- setup times
- earliness tardiness
- total tardiness
- case study
- release dates
- precedence constraints
- minimizing makespan
- parallel machines
- data sets
- limited capacity
- job shop scheduling problem
- mathematical theory
- unrelated parallel machines
- test bed
- genetic algorithm