Login / Signup

Two-level principal-agent model for schedule risk control of IT outsourcing project based on genetic algorithm.

Hualing BiFuqiang LuShupeng DuanMin HuangJinwen ZhuMengying Liu
Published in: Eng. Appl. Artif. Intell. (2020)
Keyphrases