Login / Signup

A pilot study for errors of commission for a boiling water reactor using the CESA method.

Luca PodofilliniVinh N. DangO. NusbaumerD. Dres
Published in: Reliab. Eng. Syst. Saf. (2013)
Keyphrases
  • pilot study
  • significant improvement
  • experimental evaluation
  • high accuracy
  • high precision
  • preprocessing
  • computational cost
  • pairwise
  • control system
  • cost function
  • fuzzy logic
  • detection method
  • programming environment