Login / Signup

Integrated Resource Assignment and Scheduling Optimization With Limited Critical Equipment Constraints at an Automated Container Terminal.

Hui LiJianbiao PengXi WangJinlin Wan
Published in: IEEE Trans. Intell. Transp. Syst. (2021)
Keyphrases