Login / Signup
Customer order scheduling problem to minimize makespan with sequence-dependent setup times.
Bruno de Athayde Prata
Carlos Diego Rodrigues
Jose M. Framiñan
Published in:
Comput. Ind. Eng. (2021)
Keyphrases
</>
scheduling problem
sequence dependent setup times
single machine
setup times
flowshop
parallel machines
precedence constraints
single machine scheduling problem
processing times
maximum lateness
np hard
release dates
total weighted tardiness
parallel algorithm
tardiness penalties