Login / Signup

Optimising multi-product multi-chance-constraint inventory control system with stochastic period lengths and total discount under fuzzy purchasing price and holding costs.

Ata Allah TaleizadehSeyed Taghi Akhavan NiakiMir-Bahador Aryanezhad
Published in: Int. J. Syst. Sci. (2010)
Keyphrases
  • holding cost
  • control system
  • lead time
  • total cost
  • arrival rate
  • assembly systems
  • planning horizon
  • objective function
  • lower bound
  • high volume
  • lost sales