Use of Intelligent Techniques for Throughput Estimation of Unreliable two-machine Production Lines with Random Processing Times: Preliminary Results.
Evangelos KarampotsisKonstantinos BoulasGeorgios D. DouniasChrissoleon T. PapadopoulosPublished in: SETN (2022)
Keyphrases
- buffer allocation
- flowshop
- processing times
- scheduling problem
- production line
- assembly line
- setup times
- scheduling jobs
- single machine
- sequence dependent setup times
- special case
- polynomially solvable
- identical machines
- production system
- parallel machines
- release dates
- single machine scheduling problem
- precedence relations
- job processing times
- resource consumption
- tabu search
- worst case performance ratio
- material handling
- strongly np hard
- ant colony optimization
- completion times
- job shop scheduling problem
- approximation algorithms
- multistage