Scheduling Coflows in Datacenter Networks: Improved Bound for Total Weighted Completion Time.
Mehrnoosh ShafieeJavad GhaderiPublished in: SIGMETRICS (Abstracts) (2017)
Keyphrases
- scheduling problem
- parallel machines
- single machine
- release dates
- maximum lateness
- release times
- upper bound
- processing times
- identical parallel machines
- identical machines
- lower bound
- worst case
- network design
- precedence constraints
- single machine scheduling problem
- real time database systems
- setup times
- scheduling algorithm
- sequence dependent setup times
- np hard
- social networks
- tabu search