A Mathematical Model and Two Fuzzy Approaches Based on Credibility and Expected Interval for Project Cost-Quality-Risk Trade-Off Problem in Time-Constrained Conditions.
Mohammad Hossein HaghighiSeyed Meysam MousaviPublished in: Algorithms (2022)
Keyphrases
- mathematical model
- trade off
- mathematical models
- construction project
- ant colony algorithm
- fuzzy controller
- simulation model
- control strategy
- high quality
- minimum risk
- quality measures
- statistical methods
- fuzzy logic
- feasible solution
- input output
- non stationary
- decision makers
- mathematical modeling
- decision making
- interval type fuzzy
- fuzzy linear programming