Sign in

Schedule risk analysis for new-product development: The GERT method extended by a characteristic function.

Liangyan TaoDesheng WuSifeng LiuJames H. Lambert
Published in: Reliab. Eng. Syst. Saf. (2017)
Keyphrases
  • risk analysis
  • dynamic programming
  • scheduling problem
  • unsupervised learning
  • statistical model
  • machine learning
  • parameter estimation