Sign in

Study on Risk Identification Method of Prefabricated PC Structure Building Construction Project.

Qin TaoChangnan TaoYao Wang
Published in: AIAM (ACM) (2021)
Keyphrases
  • cost function
  • objective function
  • signal processing
  • optimization method
  • optimization model
  • data mining
  • probability distribution
  • statistical analysis
  • optimization algorithm