Login / Signup
Study on Risk Identification Method of Prefabricated PC Structure Building Construction Project.
Qin Tao
Changnan Tao
Yao Wang
Published in:
AIAM (ACM) (2021)
Keyphrases
</>
cost function
objective function
signal processing
optimization method
optimization model
data mining
probability distribution
statistical analysis
optimization algorithm