Login / Signup
Joint determination of lease period and preventive maintenance policy for leased equipment with residual value.
Wen Liang Chang
Hui-Chiung Lo
Published in:
Comput. Ind. Eng. (2011)
Keyphrases
</>
preventive maintenance
scheduling problem
maintenance activities
maintenance cost
flowshop
optimal policy
database
neural network
storage space
genetic algorithm
metadata
search algorithm
data analysis
multi dimensional