Login / Signup
Quality of protection through control-message scheduling in optical mesh networks.
Gokhan Sahin
Suresh Subramaniam
Published in:
DRCN (2003)
Keyphrases
</>
flexible manufacturing systems
control system
high quality
dynamic scheduling
email
data quality
control strategy
higher quality
scheduling problem
three dimensional
scheduling algorithm
quality measures
control method
real time control
flow control
shop floor