Login / Signup
A Semantic Digital Twin for the Dynamic Scheduling of Industry 4.0-based Production of Precast Concrete Elements.
Simon Kosse
Vincent Betker
Philipp Hagedorn
Markus König
Thorsten Schmidt
Published in:
Adv. Eng. Informatics (2024)
Keyphrases
</>
dynamic scheduling
process planning
flexible manufacturing systems
case study
computer aided design
grid services
database systems
natural language
computer aided
manufacturing systems